CATL aims to build a battery factory with an annual capacity of 100 GWh in Debrecen, if all the planned phases are carried out. Since the specific energy demand for the production of lithium batteries (based on 1 kWh of battery capacity) can reach 50-65 kWh based on the available evidence, the future annual energy demand of the plant can …